Profile: VAP Full Assessment

Version 8.1.0 | Released: 2026-09-27 | Status: Active
Subject Type: Facility | Criteria: 5

The complete RBA Validated Assessment Program covering all 33 criteria across labor, health and safety, environmental, ethics, and management system categories. This full assessment is the standard VAP assessment type for comprehensive facility-level ESG evaluation.

Full Description

RBA VAP Standard V8.1.0

Responsible Business Alliance Advancing Sustainability Globally


Table of Contents

  1. Introduction
  2. Key Links to VAP Resources
  3. Validated Assessment Program (VAP)
  4. VAP Process
  5. Preparation for the Assessment
  6. Assessment Process
  7. Assessment Report
  8. RBA Appeals and Guidance Mechanism
  9. Waivers, Exceptions to Applicable Law, and Collective Bargaining Agreements (CBA’s)
  10. Corrective Action Plans (CAPs)
  11. Closure Assessments
  12. VAP Standard
  13. References

1. Introduction

1.1 Objective

The mission of the RBA is that members, suppliers, and stakeholders collaborate to improve working and environmental conditions and business performance through leading standards and practices.

Fundamental to the RBA Code of Conduct (hereby referred to as "RBA Code") is the understanding that a business, in all its activities, must operate in full compliance with the laws, rules, and regulations of the countries in which it operates. The RBA encourages companies to go beyond legal compliance, drawing upon internationally recognized standards to advance responsible business conduct.

The RBA Code may be voluntarily adopted by any business, and applied by that business to its direct and indirect supply chain and subcontractors. To adopt the RBA Code and become a participant ("Participant"), a business shall declare its support for the RBA Code and seek to conform to the RBA Code and its Standards in accordance with a management system as set forth in the Code.

For the RBA Code to be successful, it is acknowledged that Participants should regard the RBA Code as a total supply chain initiative. At a minimum, companies shall require their next tier suppliers to acknowledge and implement the RBA Code. The RBA is committed to obtaining regular input from stakeholders in the continued development and implementation of the RBA Code.

This document is intended to provide the minimum conformance requirements to comply with the RBA Code, as well as to serve as a guideline for a deeper understanding of these core requirements by offering companies elements they can implement in their operations to demonstrate compliance to the RBA Code. Throughout the document, the requirements and additional guidelines will be clearly separated to differentiate the obligations from the optional implementation paths.

1.2 Document Format

This document begins with a program and process explanation on the RBA Code and RBA Validated Assessment Program (VAP) and Assessments that utilize the VAP protocol.

The VAP Standard follows the process explanation. The information below explains how the VAP Standard part is formatted:

Each element of the RBA Code is presented in this document covering the following elements:

  1. The minimum conformance requirements: These are the implementation requirements that must be met by an Entity to show full conformance to the RBA Code. The requirements are structured as below:

    Minimum Conformance Requirements

    Core Requirement Specific Conditions
    Defines the key risk to be controlled and the required outcome Defines any non-negotiable specific conditions that must still be met
  2. Serious conditions that would be considered as priority risk as per the RBA Code: For each Code element, a list of conditions that would be considered priority risk is provided.

Finally, Annexes are available at the end of the document to support the Entities in further understanding the RBA VAP, as well as in internal evaluations to understand their level of preparedness or compliance against the RBA Code of Conduct and a possible RBA Assessment. These include:

  • Annex 1 - Additional Guidance: These are guidelines Entities can follow to support their implementation of the minimum conformance requirements, and where needed, to aspire for leadership-level improvements. Where relevant, the additional guidance annex provides specific clarification on concepts, and provides visuals for better understanding.
  • Annex 2 - Required/Relevant Documents List: This list is to support Entities in preparation for a VAP. The Critical Document List within this annex is especially important for Entities to have a smooth start into their activity.
  • Annex 3 - Definitions: This annex provides the definitions of the most important concepts used throughout this document.
  • Annex 4 - Health and Safety Checklists: These checklists are prepared to support the Entity in understanding their potential gaps compared to the RBA VAP criteria. They can be utilized for continuous monitoring, as well as for pre-assessment purposes.
  • Annex 5 - Prison Labor Checklist: This checklist is specifically designed to support the Entity in understanding their potential gaps compared to the RBA VAP criteria if they utilize prison labor. Similar to Annex 4, this checklist can be utilized for continuous monitoring, as well as for pre-assessment purposes.


3. Validated Assessment Program (VAP)

The goal of the VAP is to measure and foster improvement in environmental, social, and governance performance and build capability within the supply chain.

The VAP produces in-depth evaluations of the social, ethical, occupational health and safety and environmental performance of Entities as measured against the assessment criteria. The assessment criteria are based on the stricter of applicable law, the RBA Code of Conduct or customer requirements.

  • Phase I Introduction
    • Initial risk assessment and code requirements
  • Phase 2 Assessment
    • Facility risk self assessment questionnaire (SAQ) - upfront improvement
  • Phase 3 Validation
    • Validated Assessment Program (VAP) Performance Improvement
  • Phase 4. Reporting
    • Risk data and trend analysis
  • Phase 5. Sustaining
    • Innovation and leadership

The objectives of the VAP are to:

  • Encourage broad understanding and adoption of leading responsible business practices by all Entities.
  • Reinforce the responsible business expectations with Entities and ensure they are working towards improvements.
  • Verify conformance with the RBA Assessment Criteria (AC).
  • Identify opportunities for improvement in Entity responsible business practices, performance, and management systems.
  • Provide Entities with objective information to determine whether responsible business commitment and expectations are being met at the Entity level.

3.1 Assessment Types Using the VAP Approach

There are four types of assessments recognized by the RBA, but only the Validated Assessment Process (VAP) and the RBA Pulse Assessment are endorsed by the RBA:

  • VAP – Validated Assessment Program
  • RBA Pulse Assessment
  • AMA – Auditee (also known as Entity) Managed Assessment
  • CMA – Customer Managed Assessment

The RBA Pulse Assessment protocol also uses the VAP protocol; however, it is not fully validated by the RBA and does not lead to a formal recognition. This is why it is not considered equal to a VAP.

3.1.1 Validated Assessment Program (VAP)

The VAP is endorsed by the RBA because it is the only RBA assessment that:

  • Compares all VAPs globally to the same assessment protocol,
  • Ensures consistency of findings and process globally with all Assessors and Entities,
  • Ensures assessment quality through a review by a high-scrutiny Quality Management process, supported by a closed-loop AI system,
  • Includes a closed-loop process incorporating feedback, driving improvement in the supply chain,
  • Provides feedback to strengthen the RBA processes and programs,
  • Measures Assessor implementation of the VAP,
  • Ensures independence: No money changes hands between the Entity and the Assessor, the RBA is the proxy,
  • Requires minimum three data points (known as Triangulation) to verify conformance or non-conformance,
  • Gives possibility for formal recognition based upon assessment performance.

The VAP protocol is applicable to different Entity sites and types:

  • Manufacturing: Main activity is manufacturing, assembly, repair, or distribution
  • Service Provider (Indirect Spend): Main activity is to provide a service such as logistics, helpdesk, IT Support, Security, Cafeteria, Building Maintenance.
3.1.1.1 VAP for Service Providers – Indirect Spend VAP

This document also acts as the baseline for an Indirect Spend VAP assessment. Any exception is defined in RBA VAP Indirect Spending Protocol

The following Entity types have been identified by RBA members as the most important in their supply chain. If further needs are identified, whereby the indirect supplier type is not listed in this document, please contact the VAP team at vap@responsiblebusiness.org:

  • a) Security

    Refers to a company, organization, or entity responsible for implementing, managing, and maintaining a comprehensive security framework designed to protect the Entity's physical and digital assets, as well as its personnel across various industries and settings, including manufacturing facilities, corporate offices, data centers, and more.

  • b) Cleaning and Janitorial Services

    Refers to a company, organization or entity that offers a comprehensive range of cleaning, sanitation, and maintenance services specifically tailored for commercial or industrial environments. This provider is responsible for ensuring that the Entity meets established cleanliness and hygiene standards, thereby contributing to a safe, healthy, and productive work environment.

  • c) Manufacturing / Logistics / Distribution

    Refers to an organization or entity that offers a range of logistics solutions designed to optimize the flow of goods and resources between the point of origin and the point of consumption. This specialized service provider may provide their service on-site or off-site customer premises and may include warehouse activities, collaborating with supply chain stakeholders to enhance efficiency, reduce costs, and ensure timely delivery, thereby contributing to the overall effectiveness and competitiveness of the supply chain.

  • d) Building and Entity Maintenance and Repair Services

    Service provider offers a comprehensive suite of services aimed at ensuring the optimal functionality, safety, and longevity of the Entity's physical infrastructure, secondary services may include cleaning and janitorial. This specialized service provider collaborates with the Entity's management to plan, execute, and manage maintenance and repair tasks that are critical to the uninterrupted operation of manufacturing processes.

  • e) Cafeteria

    Service Provider contracted to manage and operate on-site food and beverage services for employees and visitors. This specialized service provider collaborates to offer a range of dining options that meet the nutritional needs, preferences, and schedules of the workforce, while also adhering to health and safety regulations.

  • f) Construction

    Service provider that offers specialized construction-related expertise tailored to the unique needs and operational complexities of a manufacturing environment. This service provider collaborates closely with the Entity's management and other stakeholders to plan, design, and execute construction projects that may include new builds, expansions, or renovations.

  • g) Material Packing and Handling

    Service provider that offers expert solutions for the efficient and secure management of materials throughout various stages of the manufacturing process. This specialized service provider collaborates with the Entity's management to optimize the flow of raw materials, semi-finished goods, and finished products, ensuring their safe and efficient packing, storage, and transportation.

  • h) Environmental Related Services (Business Process)

    Service provider that offers a range of specialized services aimed at assessing, managing, and improving the environmental performance and sustainability of the Entity. Such as Waste management, chemical management, hazardous substances management, water management and other related activities. This provider collaborates with the Entity's management to develop and implement strategies that align with environmental regulations and industry standards.

  • i) IT Services

    Service provider that offers a range of technology solutions specifically designed to support and optimize the Entity's manufacturing processes, data management, and cybersecurity. A non-exhaustive list of provided services include:

    • Call center activities
    • IT Infrastructure Management: Designing, implementing, and maintaining the hardware and software infrastructure required to provide a service
    • Data Management: Providing solutions for the secure storage, retrieval, and analysis of data
    • Cybersecurity: Implementing robust cybersecurity measures to protect sensitive data and control systems from unauthorized access, data breaches, and cyber-attacks
    • Process Automation: Offering solutions for automating repetitive tasks and processes, thereby increasing efficiency, and reducing human error
    • Network Management: Overseeing company's internal and external communication networks to ensure reliability and security
    • Compliance and Auditing: Assisting the Entity in adhering to industry-specific regulations and standards related to data protection and cybersecurity

    Technical Support and Maintenance: Providing ongoing technical support and maintenance services to ensure the optimal performance of IT systems and to address issues as they arise

  • j) HR Support

    Service provider that offers a range of human resources solutions aimed to optimize workforce performance, ensure regulatory compliance, and foster a safe and inclusive work environment. Services may include:

    • Recruitment and Onboarding: Assisting in the hiring process by identifying suitable candidates, conducting interviews, and facilitating the onboarding process to integrate new employees into the Entity.
    • Training and Development: Offering customized training programs aimed at skill enhancement, safety protocols, and compliance with industry-specific regulations.
    • Employee Relations: Providing expertise in conflict resolution, grievance handling, and fostering a positive work culture.
    • Compliance Management: Ensuring that the Entity adheres to labor laws, occupational safety standards, and other relevant regulations through regular assessments and policy reviews.
    • Compensation and Benefits: Advising on competitive salary structures, benefits packages, and incentive programs to attract and retain skilled labor.
    • Performance Management: Implementing performance appraisal systems to evaluate employee productivity, set objectives, and identify areas for improvement.
    • Workforce Planning: Assisting in the strategic allocation of human resources to meet production targets and organizational goals.
    • Data Management: Utilizing HR software to manage employee records, payroll, and other HR-related data efficiently.
    • Legal Advisory: Providing guidance on employment contracts, labor disputes, and other legal matters pertaining to human resources.
  • k) Freelancer

    It is an individual who offers specialized services on a contractual or project-based basis rather than being employed by a single organization. Freelancers operate independently, managing their own schedules, work locations, and client relationships. They are responsible for their own taxes, benefits, and other administrative tasks associated with self-employment.

Within the scope of an Indirect Spend VAP, the total number of workers in the legal entity providing the services is considered to determine the company size.

Company Size Classification

  • Small (S): Companies with a maximum of 50 workers.
  • Medium (M): Companies with a minimum of 50 workers and a maximum of 250 workers.
  • Large (L): Companies with more than 250 workers

For in-scope workers, the assessment will consider the number of workers assigned to the services or products being provided to the customer either in a single location or in multiple locations.

3.1.2 RBA Pulse Assessment

The RBA Pulse Assessment is a shorter assessment that focuses on the most critical risks in the supply chain. It utilizes a subset of the VAP assessment criteria to evaluate the situation at the time of the assessment. This assessment type is only available to a specific group of Entities that meet the eligibility criteria. The criteria are as below:

Pre-requisite: The Entity has completed the Facility SAQ on RBA-Online.

Conditions for eligibility:

  1. The Facility SAQ shows a Medium or Low Risk, OR
  2. The total number of in-scope workers for the Entity is maximum 250.

RBA members or their suppliers may prefer the RBA Pulse Assessment for the use cases below:

  • First time assessment or new to due diligence
  • Low leverage
  • As a risk check before entering a contractual agreement/procurement
  • N-tier supply chain, beyond tier 1

More information on the RBA Pulse Assessment is available on the RBA Pulse Assessment Standard.

3.1.3 Auditee (also known as Entity) Managed Assessment (AMA)

An Auditee (Also known as Entity) Managed Assessment (AMA) is an assessment that is paid for and overseen by the Entity and conducted on their own Entity. Due to the lack of fourth-party oversight and the lack of global consistency, the AMA is not equivalent to the VAP. An AMA is NOT endorsed by the RBA.

The intention and purpose of an AMA is to allow Member Companies to manage third-party assessments to meet Membership Compliance Program (MCP) requirements.

Member Companies may or may not choose to accept an AMA.

  • AMAs may be conducted by an outsourced RBA approved assessment firm and Assessor or by member company employees if those employees are RBA approved Assessors.
  • Entities are responsible for ensuring that a CAP is developed, and non-conformances are properly identified and remediated.
  • AMAs follow and use the general VAP processes (Assessor qualification, assessment process including but not limited to number of interviews, reviewing documentation, verification of findings, etc.) and tools (e.g. assessment protocol).
  • Each Member Company which conducts an AMA is responsible for ensuring that VAP requirements are adhered to when managing and conducting this assessment.

For additional information on the AMA process, please contact the RBA via vap@responsiblebusiness.org.

3.1.4 Customer Managed Assessment (CMA)

A Customer Managed Assessment (CMA) is an assessment of an Entity that is paid for and overseen by an RBA Member Company. CMAs may only be conducted by member companies. Due to the lack of fourth-party oversight and the lack of global consistency, the CMA is not equivalent to the RBA VAP. A CMA is NOT endorsed by the RBA.

A CMA, similar to a VAP, must be managed on RBA-Online. To be considered a CMA and to use the RBA name, the CMA must be on the RBA-Online, using the RBA tools such as the Working Hours Template, the Workforce Composition Survey, along with the standard reporting template.

  • The intention and purpose of a CMA is to allow Member Companies to manage assessments meeting Membership Compliance Program requirements. CMA's are only to be used by Member Companies to assess their own supply chain.
  • Member Companies may or may not choose to accept a CMA from other companies.
  • CMAs may be conducted by an outsourced RBA Approved Assessment Firm and Assessor or by Member Company employees, if those employees are RBA Approved Assessors.
  • The Member Companies are responsible for ensuring that a CAP is developed, and issues are properly identified and remediated.
  • CMAs follow and use the general VAP processes (Assessor qualification, assessment process including but not limited to number of interviews, reviewing documentation, verification of findings, etc.) and tools (e.g. assessment protocol).
  • Member Companies which conduct a CMA are responsible for ensuring that the VAP Process requirements are adhered to when managing and conducting these assessments.

For additional information on the AMA and CMA processes, please contact the RBA via vap@responsiblebusiness.org.

3.1.5 Assessment Comparison

A comparison of the various aspects of the VAP, CMA and AMA are provided below:

Aspects Validated Assessment Program (VAP) Customer Managed Assessment (CMA): 3rd Party Assessor CMA: Customer (2nd Party) Auditee (also known as Entity) Managed Assessment (AMA): 3rd Party Assessor AMA: Entity (1st Party)
Type of Assessor 3rd Party Assessor 3rd Party Assessor Customer (2nd Party) 3rd Party Assessor Entity (1st Party)
Assessment quality management RBA AQM Audit firm Audit firm Audit firm Audit firm
Assessor required to be RBA-approved ✓ ✓ ✓ ✓ ✓
Fulfils membership requirements ✓ ✓ ✓ ✓ ✓
Must be submitted in RBA-Online ✓ ✓ Varies Varies Varies
Available through RBA-Online ✓ ✓ Varies Varies Varies
Assessment based on VAP Protocol ✓ ✓ ✓ ✓ ✓
Number of assessment days & worker interviews based on number of in-scope workers ✓ ✓ ✓ ✓ ✓
Assessment scope includes entire Entity (subject to restricted access areas) ✓ Varies Varies Varies Varies
Assessment report is owned by the Entity ✓ Varies Varies ✓ ✓
Report may be shared ✓ Varies Varies Varies ✗
Assessor from RBA Approved Assessment Firm ✓ ✓ N/A ✓ N/A
RBA Quality Management ✓ ✗ ✗ ✗ ✗
RBA Recognition possible ✓ ✗ ✗ ✗ ✗

3.1.6 VAP Variations

The VAP is designed to fulfill the needs of an RBA member in their sustainability journey, ranging from new factory evaluations to special investigations triggered by members, NGO's, or media reports; the programs offered and listed in this section may vary overtime.

3.1.6.1 New Factory Evaluation (NFE)

A NFE is a VAP conducted prior to the commencement of operations at a brand-new Entity: an Entity which has just been built with no implementation records. The NFE is NOT a full VAP. The focus of NFE is the regulatory compliance, as well as policies and procedures related to the RBA Code.

The NFE is intended to be the pre-assessment for a new Entity and is used to determine if an Entity is in compliance with the applicable laws and regulations and the RBA Code of Conduct prior to the commencement of production.

The report for the NFE is valid for one year from the last day of the NFE (i.e., closing meeting).

3.1.6.2 VAP 90

A VAP90 is a full VAP conducted 90 days after the start of operations at a brand-new Entity.

The VAP90 is designed for an Entity which has been recently built and operating for less than 6 months. The VAP90 may also be used as a follow-up to the New Factory Evaluation (NFE) which is conducted prior to production beginning.

It is a full VAP, with the same scope and requirements with one exception. The sample size of the data record is 3X the sample size for the month immediately prior to the assessment. Example: If the sample size is 20 workers the data record to review will be 3x20 (60)

The report for the VAP 90 is valid for one year from the last day of the Assessment (i.e., closing meeting).

VAP90 is performed by RBA third-party approved Assessors, with the same standards as the VAP program.

3.1.6.3 RBA Customized Assessments and Investigations

A Customized Assessment is a limited scope assessment, using a subset of the VAP protocol. The scope of a Customized Assessment is flexible and is decided by the RBA member. The final report is loaded into RBA-Online. The customized assessment is overseen by the RBA and conducted by one of the approved assessments firms, but is not eligible for recognition.

An investigation is an immediate response to an egregious issue, driven by a member or credible source to the RBA. The scope of an Investigation is the elements of RBA Code of Conduct which there are claims of non-conformance (a subset of the full VAP). The investigation report is not available in RBA Online.

For additional information on VAP variations, please contact RBA vap@responsiblebusiness.org.

3.2 Assessment Report Validity Period

An Assessment Report is valid for two (2) years from the date of the Initial Assessment's closing meeting, unless a major change occurs within the Entity.

3.3 Roles and Responsibilities

3.3.1 RBA Staff

RBA Staff is responsible for VAP oversight, including:

  • Providing guidance and direction regarding the VAP Program,
  • Managing the RBA Code of Conduct review and revision process,
  • Managing associated work groups, stakeholders, Member Companies, and others who have an interest in the VAP,
  • Managing the finances associated with the VAP,
  • Updating all program tools and documents,
  • Providing and maintaining the data system that allows customers and suppliers to share the assessment reports,
  • Reporting program metrics and analysis to RBA and relevant RBA working groups,
  • Developing appropriate training programs for VAP users and Assessors.

3.3.2 Assessment Program Management (APM)

Assessment Program Management (APM) is an RBA process that coordinates the VAP activities. The RBA Assessment Program Managers' (APMs) responsibilities include:

  • Managing Assessment Firm contracts,
  • Managing Assessment Firm performance,
  • Approving and maintaining the qualification of Assessment Firms and Assessors, including ensuring Assessors have the required work experience, assessing skills, receive the proper training, and appropriate certification to conduct RBA assessments,
  • Managing and overseeing the end-to-end administration efforts for each assessment,
  • Providing help desk support for Assessments,
  • Reporting all priority non-conformances identified during the assessment to Member Companies identified by the Entity,
  • Obtaining and reviewing feedback from Entity management after an assessment,
  • Managing a continuous improvement model that includes a closed-loop process incorporating feedback, driving improvement in the supply chain,
  • Implementing other VAP projects as necessary.

3.3.3 Quality Management (QM)

Quality Management (QM) is a process and service responsible for the integrity and quality of the VAP activities and reports. Assessment Quality Managers' (AQMs) responsibilities include:

  • Verifying that non-conformances and ratings meet RBA criteria,
  • Managing guidance, issues and escalations during an Assessment from Assessors and Entities during an assessment,
  • Coordinating Assessment Report finalization with Assessors and Entities using RBA as an escalation point,
  • Reviewing and incorporating relevant Entity feedback in the Assessment Report,
  • Reviewing draft Assessment Reports, to ensure quality and consistency with RBA criteria,
  • Conducting shadow audits on a sample of Assessors to evaluate on-site performance against the RBA criteria,
  • Measuring Assessors and Assessment Firm's performance and consolidating this information with RBA senior management for review with the Assessment Firms,
  • Releasing the final Assessment Report in RBA-Online,
  • Implementing other special projects as requested by the RBA.

3.3.4 Assessment Firms

Assessment Firms ensure the assessments are conducted and reported in accordance with the expectations, guidance and timelines defined in this document. They communicate with the APM and the AQM to increase the overall consistency and quality of the assessment and the Assessment Report.

Assessment Firms must assign competent Assessors who act in an ethical and responsible manner. Assessment Firms must confirm that Assessors conducting assessments have received the required training and have the proper experience. All Assessors must be on the RBA Approved Assessor list.

For more information about assessment firm approval and requirements, see the RBA Assessor Guidebook.


4. VAP Process

4.1 Initial Assessments

4.1.1 Assessment Scheduling

Initial assessment can be scheduled at any time the Entity is ready to do so. The time to schedule an assessment varies. Assessments may be scheduled up to 9 months in advance.

Refer to VAP request process for additional reference.

4.1.2 Assessor Selection

All assessment firms with expertise local to the Entity are available for selection by the APM.

The APM selects the assessment firm, and the assessment firm assigns the Assessors to conduct the VAP. The assessment team must meet the requirements noted in the RBA Assessor Guidebook

Assessment assignment is determined by assessment firm performance, performance measures include:

  • Assessment Quality
  • Accuracy
  • Professionalism
  • Timeliness
  • Availability
  • Cost

The RBA, at its discretion, may work directly with assessment firms to assign Assessors as required.

4.2 Priority Closure Assessments

4.2.1 Assessment Scheduling

The scheduling process for a Priority Closure Assessment can be initiated once the Priority non-conformances are confirmed by the QM. Priority Assessments are scheduled by the APM in accordance with the RBA VAP timelines. For Entities owned by RBA members, these should be per the Membership Compliance Guidelines.

Priority Closure Assessments utilize the criteria and protocol used in the Initial Assessment. Exceptions require APM approval.

4.2.2 Assessor Selection

When Priority Assessments are required, if viable, the Assessment Firm which conducted the Initial Assessment will be assigned to conduct the Priority Assessment. Exceptions to this policy may arise when:

  • The Assessment Firm is not available during the time window required to conduct the assessment.
  • There are ethical issues, or potential ethical issues, with the Assessor or Assessment Firm.
  • There are extenuating circumstances, as determined by the APM, which require a different Assessment Firm (for example, a highly technical issue that requires an Assessment Firm with a specific skill set or knowledge base).

If a different Assessment Firm is needed to conduct a Priority Closure Assessment, the selection process is the same as for an Initial Assessment.

4.3 Closure Assessments

4.3.1 Assessment Scheduling

Closure assessments can be conducted once three months' worth of improvement/closure evidence for a finding is available.

Example: Initial assessment was conducted in January 2025. Excessive working hours finding identified. Entity needs to be able to show at least three months of improved records after January 2025 to be eligible for a Closure Assessment. This means, the earliest Closure Assessment can take place in May 2025, with the improved records of February, March and April reviewed.

If the Closure Assessment is requested after 18 months from the Initial Assessment, it is required that an Initial Assessment be conducted rather than a Closure Assessment. Any exception must be approved by APM.

Closure Assessments utilize the criteria and protocol used in the Initial Assessment. Exceptions require APM approval.

4.3.2 Assessor Selection

If the Closure Assessment occurs within 6 months after the Initial Assessment, the APM assigns the Assessment Firm which conducted the Initial Assessment to conduct the Closure Assessment. Exceptions to this policy may arise when:

  • The Assessment Firm is not available during the time window required to conduct the Assessment.
  • There are ethical issues, or potential ethical issues, with the Assessor or Assessment Firm.
  • There are extenuating circumstances, as determined by the APM, which require a different Assessment Firm (for example, a highly technical issue that requires an Assessment Firm with a specific skill set or knowledge base).

If a different Assessment Firm is required to conduct a Closure Assessment, or if the Closure Assessment occurs later than 6 months after the Initial Assessment, the Assessor selection is the same as for Initial Assessment.


5. Preparation for the Assessment

Assessments require preparation by the Assessors and the Entities. A successful assessment is an assessment which accurately reports the conformance performance of the Entity to the RBA Code. This requires an understanding of the RBA Code by both the Assessor and the Entity.

5.1 Optional Entity Trainings

It is recommended that an Entity who is new to the VAP process, or those that would like to learn more about the VAP, attend an assessment preparation training class, helping them to learn about the assessment process, the RBA Code of Conduct, RBA expectations, and how to better prepare for the assessment.

Training Options

In person training events featuring our newly formed dedicated Training team: https://www.responsiblebusiness.org/training-events/code-vap-training/

Factory Lead Certification Program: http://www.responsiblebusiness.org/resources/flcp/

5.2 RBA VAP Overview

For bigger and/or higher-risk facilities, the Assessment is generally a multi-day event with multiple Assessors. For smaller and/or lower-risk facilities, the Assessment may be one day, or conducted with one Assessor. The exact number of person-days and number of Assessors conducting the assessment is determined by the APM, based on the size, location, number of in-scope workers and scope of operations.

The assessment criteria are based on the RBA Code of Conduct and local legal requirements. The criteria cover five main areas:

  • Labor
  • Occupational Health & Safety
  • Environmental
  • Ethics
  • Supply Chain Management

The Assessment includes:

  • Site observations
  • Reviews of records, programs, procedures, and policies
  • Interviews with management, representative of labor agent (if applicable), third party service providers, representatives from vocational school, contractor's representative, and workers.

5.3 Assessment Scope

For VAP of a manufacturing Entity, the entire Entity is 'in scope.' In scope means that all buildings and sections or areas are subject to the VAP. This includes, but is not limited to:

  • All lines of business and all Entity customer's production areas
  • Production and supporting non-production areas (equipment rooms, wastewater treatment, maintenance shops, etc.)
  • Common areas
  • Office areas
  • Storage areas (material warehouse, shipping and receiving, chemical and waste storage, etc.)
  • Canteens and kitchens
  • Dormitories, hostels, and any off-site housing of workers/migrant workers (if company, Entity, or labor agent owns/rents accommodation for workers)
  • Security room(s)
  • Surrounding land within border of factory property

An Entity may request a reduced-scope VAP for any of the following reasons only, however Entities may choose to proceed with assessments where one or more of the below conditions exist without limiting the scope at their discretion:

  • Site has more than 40,000 in-scope workers
  • Operations at the site that are not within the industry of the Entity being assessed
  • Section(s) of the site are not accessible due to proprietary, or confidentiality reasons and written confirmation must come from the head office (management) of the Customers. However, workers working in these areas will be subjected to the workers interview as per the sampling methodology.
  • Site has different companies operating within the same Entity, which must include one or more of the following:
  • Operating under a different legal entity or license
  • Having different management systems (including tracking of hours and pay) and management teams.
  • More than 5 kilometers between facilities, if they are included in one assessment, then APM would include travel time at the scoping stage
  • May not share employees (employees cannot go back and forth between companies without resigning from one company and being hired at the next)

To initiate a scope exemption, the Entity or RBA Member Company must submit a written request to the APM during the assessment scoping via vap@responsiblebusiness.org.

5.4 In-scope Workers Decision Tree

Starting point: Person performing work for Entity / at Entity's site

  1. Managerial / professional employee / office staff?
    • Yes → Out of scope
    • No → go to step 2
  2. Direct workers?
    • Yes → In-scope
    • No → go to step 3
  3. Indirect worker: Related to core business?
    • Yes → In-scope
    • No → go to step 4
  4. Meet the OSP definition?
    • Yes → E4. Supplier Responsibility
    • No → Out of scope

In-scope workers are defined by their employment terms at the Entity. The decision tree above will help the Assessor and the Entity decide on the level of inclusion and risk management needed on different types of workers.

5.5 Entity Preparation Requirements

Prior to the assessment, the Entity must:

  • Complete the RBA Facility Risk Assessment Questionnaire (SAQ).
  • Confirm the assessment dates (start and end) with the assessment firm.
  • Provide information on travel logistics, as requested, travel restrictions, and any other special considerations.
  • Participate in the pre-assessment meeting (Subsection 9.5) and documentation review.
  • Understand the on-site assessment agenda.
  • Prepare and provide documents requested by the assessor, if any, prior to the assessment start date.
  • Ensure that relevant information is available for the assessors when they arrive, including:
    • i. Names, phone numbers and locations of the Entity's key people, as defined by the assessor
    • ii. Maps of the site and surrounding area
    • iii. Most current manuals, records and documentation required by the assessor
    • iv. Ensure that assessors will have access to all areas of the Entity that are considered in scope for the assessment (e.g. dormitories, canteens, manufacturing, assembly, chemical storage areas, ...).
    • v. Ensure that working hours records and wage data are available.
    • vi. Invite appropriate staff members to the opening meeting, closing meetings, daily wrap-ups, and to accompany the assessors during the site inspection.
    • vii. Provide the assessors with meeting room(s), preferably with access to a telephone/internet line, printer and copy machine.

During the Assessment, the Entity must:

  • Populate the working-hours template after the assessors have selected the samples.
  • Make appointments and set the interview schedule, as requested by the assessors.

5.6 Pre-assessment Meeting

After the assessment is assigned to an Assessment Firm, and a Scoping Agreement is finalized, a pre-assessment meeting between the Assessor and Entity must take place for announced and semi-announced assessment only. There will be no pre-assessment meeting for unannounced assessment. This communication may occur by phone, web conferencing (secured network) or through email.

For RBA assessments, the assessment firm is responsible for scheduling and conducting a pre-assessment meeting with Entity management; this pre-assessment meeting should take place between 3 to 10 days prior to

  • the announced assessment date, or
  • commencement of the assessment 'window' for semi-announced assessment.

NOTE: If the Entity has not been contacted by the Assessment Firm 3 days prior to the Assessment contact RBA APM for assistance vap@responsiblebusiness.org

The following items should be addressed in the pre-assessment meeting:

  • Assessor introduction
  • APM approved Assessment scope
  • Assessment agenda
  • Interpretation and translation needs; mainly for worker interviews
  • Travel requirements, if there are any, during the Assessment (auxiliary or support buildings, different facilities, ...)
  • Logistics, if needed (directions, preferred hotels and/or airports, travel restrictions and any special considerations, GPS coordinates of main entry gate to Entity)
  • Site safety and security requirements
  • Documentation preparation

Documentation preparation:

  • Confirm the documents that will be needed and must be ready at the start of the assessment:
    • RBA Workforce Composition Survey
    • RBA Working Hours Template
  • Confirm whether there are any additional documents and records that are needed for the assessment team to prepare for the assessment (e.g. organizational chart, key staff members, on-site suppliers, ...)

For Indirect Spend VAP, the Assessor shall contact both the management team at the Entity location as well as the sites where the workers are deployed. Worker interviews and a facility tour should be arranged (where possible) at the sites where workers are deployed.

5.7 RBA Assessment Observer Requirements

Observers who meet the minimum RBA conditions may be present during an assessment. This helps with the quality and integrity of the process, as well as to receive improvement feedback on the performance of the assessment firms and Assessors from another party on-site.

The observer's role is to monitor the assessment process and provide constructive feedback to the RBA on both the methodology of the assessment and the performance of the Assessors.

While the RBA may provide exceptions, the overall requirement is that the observer must be from an RBA Member Company with at least an active Trading Relationship with the Entity, from the Entity company's own workforce, or from an Assessment Firm. The observer must have:

  • Social and/or environmental expertise, or
  • VAP or relevant assessment experience.

Only 2 internal observers (observers from the Entity company) and only 1 RBA Member Company observer are allowed per assessment. Only 1 Assessment Firm observer is allowed per assessment.

RBA reserves the right to remove any observer from a live assessment if the observer rules are not followed.

5.7.1 Observer Rules

The APM must be:

  • Notified of the observer at least 2 weeks before the start of the assessment
  • Provided with the name of the observer, company, email address and mobile number

The observer:

  • May participate in site observation in the following areas:
    • Common areas (e.g. canteen, dormitories, general staff areas, pollution control, etc.)
    • Production areas specific to the observer's company
  • May observe and participate in the document review but may only review documents that either apply to the Entity as a whole or those related to their company's business with the Entity.
  • Will not interfere with the Assessment in any way.
  • Will not advise or influence the Assessment Firm regarding the findings, process, scoring, or other parts of the Assessment.
  • Will not advise, guide, or interfere with the management of Entity.
  • Will be introduced by the Assessment Firm as the Observer in interactions with staff during the Assessment.
  • Will not participate in any formal interviews and may also be required not to participate in some or all informal interviews.
  • Will attend all key on-site assessment meetings, including the opening and closing meetings.

At the end of the Assessment, the Observer completes the Observer Feedback Form and submit to the APM.

The Assessor keeps all information regarding workers, information learned from interviews, and all proprietary information confidential from the Observer.

Exceptions to these guidelines may be given by the RBA.


6. Assessment Process

The VAP and related protocols are conducted using the following process:

6.1 Assessment Start

Upon site arrival, the Assessors will present identification.

The Assessor(s) must bring with them all assessment tools and equipment necessary for the assessment. Any personal protective equipment (PPE) that the Entity needs to provide to the Assessors must be provided the latest before the Site Tour begins.

6.2 Opening Meeting

All assessments begin with an opening meeting. Assessors are required to use the most up-to-date RBA Assessment Opening Meeting Template, as provided by RBA, as a foundational guide. However, the template may be adapted as necessary to address the specific requirements or situations.

6.2.1 Assessor Requirements

The Assessor discusses the following topics in the opening meeting:

  • Purpose and objectives of assessment
  • Assessment schedule, scope, and approach
  • Discussion of site observations, interviews, record reviews, taking field notes
  • Discussion of representative sampling
  • Introduction of assessment observers
  • Preparation for daily wrap-ups and closing meeting including APM notifications of priority findings

The Assessors should answer any questions the Entity may have.

6.2.2 Entity Requirements

The Entity should discuss the following in the opening meeting, if applicable:

  • Visitor safety, security, and escort protocols
  • Responsible business program and organizational assignment of responsibilities
  • Responsible business goals, performance, and current issues
  • Business climate for the Entity
  • Review of Entity operations
  • Identification of notable site activities occurring during the time of the assessment including the seasonal changes of production load – high, moderate, and low months/seasons.
  • Major changes since the last assessment
  • Review of the pre-assessment documentation
  • Interview schedules
  • Identification and location of the Assessor work room(s)
  • Phone and internet protocol and support personnel
  • Review of site work hours
  • Other information relevant to the Assessors and the assessment process

The Entity is free to invite any Entity site staff or employee to the opening meeting.

6.1 Interviews

Worker interviews are a sensitive topic, and proper management of the interview process is an important element of the Assessment.

There shall be no retaliation (e.g. reduction in pay or benefits, losing jobs, intimidation, or any other penalties) for any information discovered during an interview.

Throughout the assessment, the Assessors interact with workers gathering information in both formal and informal situations. Formal interactions are when the Assessors select and interview certain in-scope workers individuals. Informal interactions occur as the Assessors have brief interactions with workers at their place of work or in other areas of the factory (e.g. dormitories, canteens, common areas, parking area).

Formal and informal interviews are conducted privately, without the presence of Entity managers, other staff, or observers. The workers' identity and comments must remain confidential.

Formal interviews are conducted in two ways: individually or in group settings. Formal individual interviews generally last about 10 minutes. Formal group interviews typically last about 20 minutes, but may take longer, if needed, at the Assessor's discretion.

Interviewees should represent a range of workers including:

  • Permanent and temporary
  • Both direct hired and indirect hired production workers.
  • Direct hired non-production workers (security, cleaners, food preparation)
  • Employees and subcontract labor
  • New hires and experienced workers
  • More and less skilled positions
  • Various departments
  • All shifts
  • All genders
  • All nationalities (limited to foreign workers who are not foreign expatriate or skilled staff)
  • Worker representatives, if present
  • Pregnant woman, nursing mothers, and workers with Disabilities if present

NOTE: Indirect hired non-production workers (security, cleaners, food preparation) are not included in the group interviews.

6.1.1 Management Interviews

Gathering information from managers provides the Assessors with an understanding of how the Entity's responsible business programs are managed and intended to be implemented.

Typically, the Assessors interact and talk with the following people (Note: not all of these people may be at the Entity, and may have different titles):

  • Site manager(s)
  • Production manager(s)
  • Maintenance staff
  • Environmental, Health & Safety manager(s)
  • Quality manager(s)
  • Internal assessment manager(s)
  • Human Resources manager(s)
  • Onsite services staff such as canteen, dormitory supervisors, security staff
  • Finance manager/payroll manager(s)
  • Procurement manager/supply chain manager(s)
  • Warehouse and chemical store manager(s)
  • Onsite medical staff
  • Legal
  • Other personnel

6.2 Site Observation

The purpose of the site observation is for the Assessors to observe physical conditions and current practices in all areas of the Entity's site.

The Assessor should have access to all areas of the Entity's site and should set the pace and direction of the site observation. During the site observation, the Assessors should endeavor to minimize disruptions to production.

It is the responsibility of the Entity to inform the Assessors of the safety rules and requirements, including the use of personal protective equipment (PPE) in specific areas, and provide the Assessors with necessary PPE where required.

There are two parts to site observation, namely site tour and site assessment.

6.2.1 Site Tour

Site tour is generally undertaken by the entire assessment team, and it will last for about 30 minutes.

At the start of the assessment, a site tour may be conducted. Portions of this site tour may take place prior to the opening meeting.

The objective of the site tour is to provide context to the Assessors of the Entity's operation and to help the Assessors prepare questions for further investigation.

The site tour may consist of:

  • Transportation infrastructure
  • Emergency services, such as fire department or outside security services
  • Identification of common areas, overview of company operations
  • Identification of potential local community and environmental concerns, which may impact or be impacted by the Entity
  • Identification of unreasonable restrictions on workers' freedom of movement or rights.
  • Any records or documents displayed that might show a discrepancy between operational activities and the protection of human rights
  • Workers' noticeboards and information relating to union or worker's committee meetings
  • Insights into the size, scope and location of all building and support facilities
  • Quality, production, and time records
  • Posting of relevant codes of conduct and any information related to their workers' rights

6.2.2 Site Assessment

The site assessment is carried out by the EHS Assessor in a multi-Assessor activity, or the Lead Assessor if the activity has a single Assessor. It may last from 2-8 hours depending on the number of areas / buildings / facilities / dormitories, and canteen to be covered.

During the site assessment, the Assessor typically inspects in detail all the high-risk areas identified during the site tour (note: not all facilities have the following areas):

  • Work environment (space, temperature, lighting, ...)
  • Ergonomics and workstations
  • Manufacturing and processing operations
  • Fire and emergency equipment
  • Machine protection and maintenance
  • Emergency procedures
  • Personal protective equipment
  • First aid equipment and medical center/clinic
  • Air emissions and emission control systems
  • Hazardous materials storage and handling
  • Hazardous waste generation and storage
  • Waste (hazardous and non-hazardous) management
  • Fuel, chemical and oil storage, transport, and use
  • Toilets and sanitation
  • Canteen and kitchen hygiene and safety, when applicable
  • Dormitory facilities including hygiene and safety
  • Wastewater treatment, discharge, and sludge disposal
  • Recreational facilities

Assessors must take photos in the Entity, as agreed by the Entity in the Assessment Agreement (AA). Alternatively, the Entity can take photos as requested by the Assessors and provide them by the end of each day to the assessment team. Photos are not intended to contain or focus on a product, product-related information, brand, or any other proprietary information. Photos must also not include any content that may identify a worker or jeopardize the personal data of anyone in the Entity.

Even though it is agreed during pre-assessment, if the management does not give permission and will not take requested photos or documents (either as a whole, or in certain areas), Assessors will document this in the report.

6.2.3 Document Review

As part of the assessment, the Assessors review relevant records. Examples include:

  • Working hour records, payroll, wages, deductions, and benefits
  • Employee profiles
  • Employment contracts
  • Permits/ licenses /approvals
  • EHS management system documentation
  • Waste management records
  • Written policies, programs, procedures, work instructions
  • Training records

The records to be reviewed are specified by the Assessors to the Entity during the assessment.

The assessors should be thorough in the review of records; however, this does not mean that every record must be evaluated. The assessor may use representative sampling in the review process. Where the assessor does not review every record and there is a non-conformance finding, the assessor must reflect the sampling method in the statement of finding.

Unless otherwise stated, the documents and records must be available on-site for assessors to review, and must cover at least the 12 months before the assessment. For payroll, wages, deductions and benefits documents and records must be available for 24 months.

Unless otherwise stated, the records shall be available on-site for assessors to review at the start of the assessment and shall cover at least the review period of the assessment. If additional records are requested, they shall be available within 24 hours from the request or before noon on the last day of the assessment, whichever occurs first. If requested records are unavailable as stated, the records shall be excluded by the assessor and result in a finding.

As part of the documentation review, the assessors may need to record some information to complete their evaluation. The assessors will not include any confidential information, such as detailed product information, detailed process steps, or personal identifiers in the Assessment Report.

Unless otherwise noted, references to percentages of workers in conformance or non-conformance in the Assessment Report are based upon the defined sample.

6.3 Daily Wrap-up Meeting

If the assessment is multi-day, daily wrap-up meetings take place at the end of each day. The wrap-up meetings take approximately 30 minutes. Any alternative arrangements must be mutually agreed by the Assessor and the entity during the opening meeting.

During the meeting, the Assessor should:

  • If Priority non-conformances were identified:
    • Discuss any Priority non-conformances, including need for immediate correction and/or containment,
  • Inform management that a formal communication of Priority non-conformances will be made to the QM, who will in turn notify the RBA member(s) who are listed as Requesting Company,
  • Make the entity aware of any issue, finding, or potential finding where additional information is needed,
  • Encourage the entity to present/prepare additional evidence or information on local legal requirements, as needed,
  • Discuss preliminary findings, providing the opportunity for the entity to provide additional information in the case of a disputed finding,
  • Agree upon the agenda for the remaining onsite assessment,
  • Clarify any further needs to ensure the assessment is performed as effectively and efficiently as possible.

6.4 Closing Meeting

The Closing Meeting is held at the end of the last day of the assessment. The same group of entity personnel, including workers that participated in the Opening Meeting, as well as any others who would benefit from hearing from the assessment team, should attend the Closing Meeting.

If the meeting is not conducted or is cut short, entities or the Assessors should notify the QM, depending on which party impacts the meeting.

The Closing Meeting includes the following:

  • A discussion of all Major, Minor and Priority non-conformance(s) to provide the entity with rounded information,
  • A discussion of items that require further studies (e.g. investigate or review relevant legislation) to establish a finding,
  • If Priority non-conformance were noted during the assessment:
    • Communicate that immediate containment actions are expected (unless working hours, recruiting fees and social insurance).
      • Immediate containment actions should be completed by the end of the assessment, or as quickly as possible if the issues were discovered late in the assessment.
      • Status of the immediate containment actions will be noted on the Assessment Finding Acknowledgement (AFA).
  • A presentation by the entity regarding additional evidence or clarifications,
  • Information to the entity on the next steps of the assessment process, including the draft review feedback process,
  • Signature of the AFA by the Assessors and the Entity management at the end of the meeting.

In general, the closing meeting should be conducted at the entity site. Upon agreement between the Assessors and the entity, the meeting can be conducted at an alternative location or remotely. Assessors should document any exception in the assessment report.


7. Assessment Report

The assessment report is a formal document describing the assessment findings and is the basis for the Corrective Action Plan (CAP).

The assessment team prepares the report and submit it on RBA-Online following . Assessment firms must employ a rigorous internal quality assurance process to ensure that all reports meet the RBA minimum criteria for quality and completeness.

The assessment findings are entered in RBA Online.

  • General information about the Entity, assessment team, site characteristics
  • Executive summary
  • Overall assessment score and assessment score detail
  • Findings related to the policies, practices, and conditions for the sections of the RBA Code
  • Supporting evidence / data

7.1 Assessment Finding Severity Definition

Findings communicated as part of an Assessment identify good practices and points of improvement. The Assessment Report provides information for the Entity's management team to improve their responsible business programs and performance related to:

  • Intent – what the Entity is trying to do
  • Implementation – how well the practice meets the defined criteria
  • Effectiveness – whether the policies and practices deliver the intended results

Assessors review the evidence gathered during the assessment and evaluate the compliance status for each question on the assessment.

Assessors classify each assessment criteria as one of the following:

  • Priority Non-conformance
  • Major Non-conformance
  • Minor Non-conformance
  • Risk of Non-conformance
  • Opportunity for Improvement (Applicable for working hours only)
  • Conformance
  • Not Applicable

Assessors review the evidence gathered during the assessment and evaluate the compliance status for each criterion of the assessment.

Based on the identified risk, the Assessor needs to assign a severity to each finding. A thorough justification must be provided for the assignment of severity. For some criteria and some conditions, the severity is already assigned in the Code Interpretation Guidance. If the Assessor would like to suggest a change to the assigned severity, a justification must also be provided on their reasoning.

The following are examples of risk factors to consider when changing the rating of a finding:

  • Health and safety risk to workers
  • Significant restrictions or violations of worker rights
  • Significant damage or risk of imminent damage to the environment
  • Non-conformance to local law
  • Reputational risk
  • Operational risk

Assessors classify each assessment criteria as one of the following:

7.1.1 Priority Non-conformance

  • Immediate risk of severe or irreversible harm to life or health, Entity, the environment, or the community
    • "Immediate risk" refers to conditions where exposure to severe harm exists at the time of assessment, not merely a potential future risk.
  • Egregious ethical breach
    • Including (but not limited to) actions that fundamentally violate ethical or human rights principles

7.1.2 Major Non-conformance

  • Violation of applicable law
  • System-level process deficiency that results in significant risk or impact, for example same incident multiple times or multiples incidents at the same time.
  • System-level process deficiency that causes the system to not work as designed.

7.1.3 Minor Non-conformance

  • An isolated implementation failure where the relevant management system is in place and generally effective
  • System-level process deficiency that results in low associated risk and impact
    • Assessor shall document a clear justification addressing why the risk is low, the impact is limited, and existing controls prevent the issue from escalating.

7.1.4 Risk of Non-conformance

  • A condition where no non-conformance is currently identified, but the effectiveness of controls to ensure sustained conformance cannot yet be demonstrated across foreseeable operating conditions or changes.
    • If evidence demonstrates that the management system or controls have already failed to prevent or detect a breach of the requirement under normal operating conditions, the issue shall be evaluated as a non-conformance, not as a risk of non-conformance.
  • Insufficient evidence to confirm conformance or non-conformance.

7.1.5 Opportunity for Improvement

  • (Only applicable to Working Hours criteria) A situation that is not fully in conformance and can be improved. Corrective Action Plan is optional but recommended.

7.1.6 Conformance

  • Conformance is noted when the Assessor determines that anpd9a Entity meets or exceeds the assessment criteria and expectations.

7.1.7 Not applicable

  • Not Applicable applies in cases where a specific operation is missing from the site, for example, facilities that do not have dormitories. In addition, the Entity has provided evidence that certain criteria do not apply.

8. RBA Appeals and Guidance Mechanism

8.1 Appeals Mechanism

At the end of a VAP process, it is possible to appeal against a finding or conclusion, the assessment process, or the overall quality of the assessment report.

An entity can raise an appeal up to 90 days following the release of their assessment report, which means the status of their VAP on RBA-Online is "VAR Released".

An appeal can only be raised when this document, or other relevant supporting documents, does not provide specific or clear information on a criterion.

An appeal can also only be raised if the entity gave the Assessor full access to collect any type of evidence, including photos or documents. This includes photos taken by the entity's management on behalf of the Assessor, and provided to the Assessor before the assessment report is released. If the entity does not allow the Assessor access to collect evidence, even though this is agreed via the Assessment Agreement (AA), then their appeal will not be processed.

To submit an appeal, please follow this link: RBA Appeal Mechanism – Link

To submit any additional evidence to support your appeal, please send an email to appeal@responsiblebusiness.org

8.2 Guidance and Manual Updates

The RBA reserves the right to periodically issue updates to this document and the related processes and guidance documents. All updates are communicated to different user groups via their dedicated connection channels.


9. Waivers, Exceptions to Applicable Law, and Collective Bargaining Agreements (CBA’s)

9.1 Waivers or Exceptions to Applicable Laws

Waivers can only be applicable to an Entity if the issuing office has the legal authority to do so. In most cases this is the national, federal, or state ministry, government body or inspectorate. Local (municipal, provincial) governments typically do not have the authority to give waivers for national regulations or requirements.

When waivers or exceptions, or the authority of the government body who provided the waiver, is in question by the Assessor or the AQM, the Entity receiving the assessment has the burden of proof to prove the waiver or exception is applicable. This includes providing documentation regarding:

  • Description of the waiver or exception
  • Explanation of why the law does not pertain
  • Proof of the authority of the government body that provided the waiver or allowance
  • Parameters, if any, which pertain to the exception
  • A copy of the letter, ruling, notification or other such documentation of the waiver or exception, which is properly sealed by the government body who provided the waiver or allowance
  • Other pertinent information

Waivers must be short-term in nature, i.e. less than or equal to 12-months in duration and approved by the government body that provided the waiver or allowance.

9.2 Collective Bargaining Agreements (CBA’s)

In order to be considered valid in the context of an assessment, Collective Bargaining Agreements (CBAs) must be:

  • Negotiated in good faith,
  • Validated by a competent authority, and
  • Within the validity window.

10. Corrective Action Plans (CAPs)

10.1 CAP Definition and Responsibilities

Corrective Action Plan (CAP) is an important part of the assessment and continuous improvement process. The purpose of the CAP is to define corrective actions for resolving any non-conformances identified during the assessment. CAP activities must occur within RBA-specified time frames and using RBA-specified processes on RBA-Online. For members, these should be in accordance to the RBA Membership Compliance Program.

The Entity is ultimately responsible for the completion of the corrective and preventive actions listed within the plan.

The CAP should include:

  • Determination of root cause(s)
  • Description of the proposed corrective actions to address root cause(s)
  • If the Entity determines that no action will be taken or is necessary in response to a non-conformance, the plan must describe the basis for this determination and why no corrective actions is required.
  • Application of a preventive action to prevent future recurrence of the problem or related issue(s)
  • The date the action is expected to be completed.
  • Current status of the action items

For Priority non-conformances, the CAP will be developed and reviewed together with the QM.

10.2 Priority Non-conformance Containment

Upon receiving notification of any priority non-conformance(s) from the Assessment Team, the Entity reviews the non-conformances and initiates containment immediately. Containment is the act, process, or means of immediately reducing a threat or lowering a risk of the situation identified in the priority non-conformance(s).

10.2.1 Priority Non-conformance Timeline

All corrective actions must be completed within the timeframes provided. Any deviations from the prescribed timelines must be approved by the APM. Priority non-conformances (other than exceptions listed in the priority non-conformance section), must be immediately contained.

Immediate • Non-conformance identified and communicated to Entity management during on-site assessment Assessment Team
≤24 Hours • Lead Assessor to Alert AQM with conclusion, immediate containment, data points and supporting evidence Lead Assessor
≤48 Hours • AQM confirms priority finding on RBA-Online, triggers alert to Authorized Recipients (Requesting Company and Attachment B Companies) AQM
≤48 Hours • Entity completes containment actions (if not already completed since the communication from Assessor) Entity
≤72 Hours • Authorized Recipient(s) contact(s) Entity to discuss situation and status Authorized Recipient(s)
7 days* • Full CAP with proposed actions on priority non-conformance(s) is submitted for review to AQM (containment in place, Entity puts in place temporary measures to ensure priority non-conformance does not re-occur) Entity
7 days* • Feedback on proposed actions is communicated to Entity
Note: AQM's review of the priority non-conformance CAP does not include an implementation review; only the proposed actions are reviewed.
AQM
7 days* • Adjust priority non-conformance CAP if needed Entity
10 days* • Implementation of approved proposed actions on priority non-conformance CAP Entity
30 days** • Closure assessment of priority non-conformance(s)
Note: The Entity remains the ultimate responsible party to initiate and manage the Priority Closure Assessment.
If there is sufficient/legitimate evidence that more time is required, the Entity must inform the APM with the details for further consideration.
Assessment Team
Entity

*Exception: Priority non-conformance for working hours where working hours is under 84hr/week and/or social insurance (timeline = timeline above plus 1 week)

**Exceptions:

  • Priority non-conformance for working hours where working hours is > 84hr/week = 90 days
  • Priority non-conformance for working hours where working hours is under 84hr/week = 180 days
  • Priority non-conformance for social security = 180 days
  • Priority non-conformance on fees (code provision A1) = 90 days

10.3 Overall CAP Timeline

The following tables show the rating definitions and associated timelines for non-conformances.

For Priority non-conformances, the timelines below are requirements, and any exception must be coordinated with the RBA. For other non-conformances, the progress/completion timelines are only used as a recommendation.

10.3.1 Priority CAP Timelines for Different Criteria

Rating Finding Submit CAP Approved CAP Reimbursement Plan Progress / Complete CAP
Priority Working Hours (≤84 h/week) and Social Insurance 7 calendar days from discovery 6 weeks from assessment report release N/A 180 days from assessment report release
Priority All other criteria 7 calendar days from discovery 10 calendar days from discovery N/A 30 days from discovery

For recruitment fee priority non-conformances, there may be steps between these timelines and completion that are required from the Entity. The RBA Compliance team will inform the Entity on all required steps depending on the specific situation.:

Rating Finding Submit CAP Approved CAP Reimbursement Plan Progress / Complete CAP
Priority Recruitment Fees (existing workers) 7 calendar days from discovery 14 calendar days from discovery Entity submits: 90 calendar days* 90 days from reimbursement plan approval
Priority Recruitment Fees (departed workers of <6 months) 7 calendar days from discovery 14 calendar days from discovery Entity submits: 90 calendar days* 270 days from reimbursement plan approval

* RBA must approve the CAP and the reimbursement plan. The CAP must include implementation steps for no fees recruitment policy(ies). The RBA compliance team will be involved and will lead the CAP and reimbursement plan review and approval if a priority finding is identified in recruitment fees.

For further information on recruitment fee reimbursement timelines, please refer to the RBA Practical Guide to Due Diligence on Recruitment Fees in International Supply Chains.

10.3.2 Non-Priority CAP Timelines

Rating Finding Submit CAP Approved CAP Recommended CAP Completion
Major All criteria 2 weeks from assessment report release 6 weeks from assessment report release 180 days from assessment report release
Minor All criteria 2 weeks from assessment report release 6 weeks from assessment report release 270 days from assessment report release

10.4 CAP Management Options for Non-priority Findings

There are 2 options available for CAP management of non-priority findings.

  • RBA-Managed CAP (paid service)
  • Customer-Managed CAP or Entity-Managed CAP

10.4.1 RBA-Managed CAP

CAP can be managed using the paid RBA Managed CAP service. The communication on the CAP and its progress is managed by the RBA, or a partner assigned by the RBA, directly with the Entity using RBA-Online. This way, only one CAP can be arranged and shared with all of the Entity's Authorized Recipients. An RBA Managed CAP is strongly encouraged for:

  • Entities who are providing a CAP to multiple customers,
  • Entities new to the RBA Assessment process, who could use additional guidance on developing or managing their CAP
  • Entities that wish to have a quality review by the RBA team.

The RBA is available as a resource, and actions taken suggested in an RBA-approved CAP will likely meet the expectations of an Assessor during the closure assessment.

The option to use the RBA Managed CAP process first appears for the Entity on RBA-Online when the draft Assessment Report is available for their review. If the Entity is not sure of the service request at the time, they can still change their CAP manager via RBA-Online up to 3 months from the release of the Assessment Report.

RBA Managed CAP is two-step process:

  • i. Review and approval of Root Cause Analysis, immediate containment actions, and management system oriented corrective actions
  • ii. Monitoring for implementation of corrective actions (monthly updates for 12 months)

Please write to vap@responsiblebusiness.org to request support or more information about this service.

The following steps, timelines and process apply to the RBA Managed CAP process for Major and Minor non-conformances:

Time Action Responsible
0 weeks • Receipt of final Assessment Report and CAP template pre-populated RBA
2 weeks • Submit completed CAP version 1 Entity
• Review and provide feedback on CAP version 1 within 2 days or approve CAP RBA
4 weeks • Submit completed CAP version 2 Entity
• Review and provide feedback on CAP version 2 within 2 days or approve CAP RBA
6 weeks • Submit completed CAP version 3 Entity
• Review and provide feedback on CAP version 3 within 2 days or approve CAP version 3
• Note: If version 3 is not approved then process ends
RBA

Below is the timeline for the follow-up of approved CAP:

Time Action Responsible
1 month from CAP approval and every following month until CAP completed or maximum of 12 months from the date of implementation of CAP • Provide monthly update of non-conformance CAP implementation progress to RBA for a maximum of 12 months Entity
1 month from CAP approval and every following month until CAP completed or maximum of 12 months from the date of implementation of CAP • Submit proof for each non-conformance conformance CAP implementation which has been completed Entity
1 month from CAP approval and every following month until CAP completed or maximum of 12 months from the date of implementation of CAP • Review of non-conformance CAP implementation progress RBA
CAP implementation completed to a maximum of 12 months from the date of implementation of CAP • Closure Assessment process management
• Note: The Entity remains the ultimate responsible party for the initiation of a Closure Assessment.
RBA
10.4.1.1 Escalation

If there is a delay in submission of CAP beyond one week, RBA may inform the relevant RBA members for support (Authorized Recipients). The RBA members can follow up with the Entity and facilitate, if needed, a timely submission of CAP or implementation updates.

10.4.1.2 Approval of Corrective Actions

The Corrective Action Plan should be approved by the RBA before any corrective actions are implemented.

RBA, or its designated partner, will review and approve the CAP for all non-conformances within two days of submission.

Once the CAP is approved, all the implemented actions must also be reviewed and approved by the RBA before they can be closed via a Closure Assessment (please refer to Monitoring Progress below). Corrective actions cannot be approved until the Entity provides a complete CAP and proof of implementation. If the Entity skips this process and decides to initiate a Closure Assessment, the RBA Managed CAP service ends.

Note: The objective of obtaining RBA approval is to ensure completeness of CAP, completeness of implementation, and use of correct RBA tools. It is not an approval or statement of conformance. Conformance can only be determined by a qualified third-party assessment firm upon detailed review through a closure assessment (remote or on-site).

10.4.1.3 Monitoring Progress

For CAPs with implementation periods greater than 30 days, the Entity must provide RBA with status updates at monthly intervals. It is the Entity's responsibility to make timely submissions.

Once the Entity confirms internally that the CAP has been fully implemented, the Entity must provide a final status update indicating the non-conformance has been addressed, together with appropriate evidence supporting this position.

The evidence must be provided via RBA-Online, using commonly accepted formats (e.g. JPEG, PDF, Microsoft Word, Microsoft Excel…). It is the responsibility of the Entity to provide evidence in a format that can be accessed by the RBA.

Evidence must have the correct references in and to the CAP template to allow easy navigation between CAP template and proof of implementation.

If the Corrective Action has not been closed in the time specified in the CAP or if the corrective action is inappropriate, the Entity must provide a proposal to address the issue in the CAP management tool.

Any changes to an approved CAP must be reviewed and authorized by the RBA or its designated partner.

10.4.2 Customer-Managed CAP or Entity-Managed CAP

The Customer-Managed CAP process requires that the Authorized Recipients (in this specific case, the Attachment B company) manage the CAP, working directly with the Entity.

A copy of the approved CAP must be uploaded to the RBA-Online. The process should ideally be run directly on RBA-Online, but in case an alternative means is used, the final version of the CAP must be made available via the platform.

Alternatively, the Entity can manage their own CAP process and communicate with their customers. Similar to the Customer-Managed CAP process, it should ideally be run directly on RBA-Online; however, if alternative means are used, the final version of the CAP must be made available via the platform.

In the case of Customer or Entity-Managed CAP, the RBA is NOT available as a resource, nor does the RBA verify the actions taken will meet the expectations of an assessor during the closure assessment.

10.5 Content of the CAP

10.5.1 Root Cause Analysis

The first step in the CAP process is to conduct a root cause analysis for each non-conformance.

"Root Cause Analysis" is a method used to identify underlying cause(s) of a non-conformance. It is used to correct or eliminate the cause and prevent the problem from recurring. If a root cause analysis is not conducted, or conducted poorly, there is a risk that time and resources may only address the symptoms of a problem, rather than addressing the real issue.

The most common element of a root cause analysis includes asking "Why a particular non-conformance occurred?" and documenting the answer.

When considering "Why" a particular problem occurred, it might be useful to consider the following potential elements to ensure comprehensive analysis:

  • Knowledge – Did the problem occur due to lack of awareness or knowledge?
  • Assignment – Did the problem occur because responsibility was not clearly assigned?
  • Tools – Did the problem occur because appropriate tools were not available?
  • Training – Did the problem occur due to lack of proper training?
  • Accountability – Did the problem occur because little/no accountability, e.g. in a typical situation nothing happens when the task is not done?
  • Resources – Did the problem occur due to insufficient resources?

The steps to identify a root cause often requires the examination of one or more of the above management systems elements for change or improvement. Some of the most common processes used to identify these elements are the 5-Why / 7-Why process and Ishikawa (Fishbone) Diagram. An Entity can always use other effective means as well.

10.5.2 Containment Action

The items below need to be considered for each root cause identified per finding. Depending on the CAP manager, the level of detail required, as well as the dedicated fields, may differ on RBA-Online:

Items to be Considered Description
Describe action to be taken to immediately reduce threat/lower risk: Description of the temporary actions taken to minimize the risk of the non-conformance.

The description needs to include at least the following components:
• Actions taken
• Communication to management, supervisors and workers on these actions
• Management system for the actions to ensure they remain in place and are effective until a permanent systems correction is implemented.
Accountable Owner Person(s) responsible at the Entity to ensure overall effective implementation of the Immediate Containment Actions
Target Completion Date Completion date of the initial implementation of all items. This can be no longer than 3 weeks from receipt of final assessment report.
• Progress" listed as:
• "On" if progressing on time or fully implemented.
• "Off" when implementation is running late. If "off," then additional actions need to be listed in remarks how implementation will be corrected within the timeline.
Actual Close Date Actual date when all items are successfully implemented.

10.5.3 Corrective Action

Corrective actions are required to be entered in line with the finding, as well as the root cause analysis determined, that will support a long-term and sustainable closure of the finding. While, depending on the CAP manager, the level of detail required, as well as the dedicated fields, may differ on RBA-Online, the items to be considered for submission are as below:

Items to be Considered Description
Policy/procedure changes Describe the details of the changes which will be made to company policy/procedures. Include a reference to the current document number and issue date). The updated policy should contain at least the items required in the RBA code as well as the process to ensure the policy is sustainably implemented.
Communications/training Describe the details of the communications and training program to ensure that all impacted workers are updated and understand the updated policy and procedures. This may include:
• Who received the communication:
◦ Management
◦ Staff
◦ Direct and indirect workers
◦ Onsite contractors/suppliers
◦ Other affected or impacted groups
• How the communication was provided:
◦ Newsletter
◦ In-person training
◦ Company blog or intranet
◦ Others
• If training is required, who received the training:
◦ Management
◦ Supervisors
◦ Workers
◦ Other affected or impacted groups
◦ Induction or new employee training
• If training is required, how the training was provided
◦ In-Person
◦ Webinar
◦ Electronic Training
◦ Other
Activity and impact measurements / KPIs Describe the indicators/measurements that will be used to monitor and ensure that the implementation of the updated policy/procedure and its communications and training are effective.

Measurement should be impact and activity based (e.g. number of trainings = activity, awareness or reduction in occurrence = impact).

• At least 3 activity indicators and 3 impact indicators are required for each non-conformance.
Accountable Owner Person(s) responsible at the Entity to ensure overall effective implementation of the Corrective Actions
Target Completion Date Completion date of the implementation of each item. This date can exceed the timing as indicated in Timelines for Completion of Corrective Actions section.
Progress • "On" if progressing on time or fully implemented.
• "Off" when implementation is running late. If "off", then additional actions need to be listed in remarks how implementation will be corrected within the timeline
Action Start Date Proposed start date for each item
Actual Close Date Actual close dates for each item.

10.5.4 Evidence

While, depending on the CAP manager, the level of detail required, as well as the dedicated fields, may differ on RBA-Online, the Entity is expected to provide sufficient proof of progress and completion on their corrective actions. This is done in the form of attaching evidence documents on RBA-Online.

For RBA-Managed CAP, the Entity is expected to provide monthly updates on their progress and completion. For other CAP management options, the frequency of sharing evidence depends on the CAP manager.

It is important to note that sharing evidence or information on the closure of a non-conformance as part of the CAP process does not mean that the non-conformance is closed definitively. It is only an indication that the Entity is ready for a Closure Assessment.


11. Closure Assessments

In the VAP process, completing a Corrective Action Plan (CAP) does not signify the closure of a finding. The closure is only verified via a Closure Assessment.

There are two types of Closure assessments:

  • Priority Closure Assessment
  • Closure Assessment

All Priority non-conformances are expected to be closed through a Priority Closure Assessment. Major and Minor non-conformances, and Risks of non-conformance are closed through a Closure Assessment.

The timing of a Closure Assessment should be based upon the type of findings in the Initial Assessment (Priority, Major, Minor, Risk of Non-conformance and whether there are working hours, recruitment fees, and/or social insurance related findings), and the timeline of completion of the CAP of the entity.

The focus of both Closure Assessment types are the issues identified in the Initial Assessment. However, if an Assessor identifies any new gap during a Closure Assessment, this is to be included as a new finding, following the same process and rules as the Initial Assessment. The entity will be expected to implement a CAP for the newly-identified finding.

11.1 Priority Closure Assessment

The purpose of a Priority Closure Assessment is not to achieve full conformance to the relevant criteria, but to remove the condition which triggers the Priority rating. Of course, if full conformance is observed during a Priority Closure Assessment because the specific situation is remediated with a view of sustainable prevention, the finding can be closed accordingly.

Priority Closure Assessment scheduling can start as of the time the Priority non-conformance is confirmed by the AQM and Assessors, which may be:

  • During the assessment
  • During the draft report stage (when more data is analyzed or during the AQM review of the draft report)
  • When the rating is changed as per the rating guidance (to correct any rating issues in draft assessment report)

The timeline for a Priority Closure Assessment depends on the nature of the finding:

  • For all issues other than recruitment fees, working hours and social insurance: 30 days from discovery
  • Recruitment fees: 270 days from reimbursement plan approval by RBA
  • Working hours and social insurance: 180 days from discovery

Other findings may also be closed during the Priority Closure Assessment. However, to be closed it must be agreed upon with the APM beforehand to ensure the assessment is properly scoped.

11.2 Closure Assessment

All assessment findings can be closed through a Closure Assessment. Unlike Priority Closure Assessments, Closure Assessments for non-priority findings are not scheduled on a set timeline, rather, these are triggered by the entity or the RBA member.

Closure Assessments can be remote or onsite, depending upon the pre-determined permission level for each finding as stipulated in the assessment criteria. Remote closures are only accepted if 100% of the scoped findings are eligible as per the assessment criteria.

11.2.1 Sampling Period for Closure Assessments

The sampling period for a Closure Assessment may vary depending on the effective date of CAP implementation. In any case, the Closure Assessment cannot use the samples that would have been covered in an Initial Assessment – the timeline of samples must be after the Initial Assessment.

Closure Assessment timing should reflect 3 months of improved implementation as of the CAP completion date and align with the Corrective Action timeframes listed in this document. Especially for Working Hours and Payment criteria, the Closure Assessment is advised to take place following the latest salary payment date of the entity, so that the full improved records can be reviewed.

Example: Working hours CAP was completed in May, the Closure Assessment is completed in October, within same calendar year, then the sampling period for working hours will be from May to September, which is the month immediately prior to the Closure Assessment).


12. VAP Standard

12.1 General Notes

The following notes apply to all the Standard elements:

  • A legal non-conformance is a Major non-conformance unless otherwise stated in a specific provision (e.g., for working hours, if a situation of Entity is below 60h/w but above local law for ≤40% of the workers) or there is another finding which has a higher non-conformance rating for that provision.

  • Unless otherwise noted, references to the percentage of workers in conformance or non-conformance are based on the defined sample.

  • A Process is not required to be in writing as per ISO. However, all processes shall be verifiably and consistently implemented.

  • A Procedure will be required in the Standard if a process must be in writing.

  • For specific criteria in the VAP, a process may be established at corporate level, at Entity level, or through a combination of both. It may also be implemented by corporate, the Entity, or both. Assessors will first evaluate where the process is established and which level is responsible for implementation, then verify evidence at the applicable level(s):

    • Corporate-level process: Where the process is established by corporate, the corporate-level process will be verified. Implementation evidence will be reviewed based on who implements the process (corporate, Entity, or both).
    • Entity-level process: Where the process is established by the Entity, the Entity-level process and related Entity-level implementation evidence will be verified. If corporate supports or performs part of the implementation, relevant corporate-level evidence will also be reviewed.
    • Joint or split process: Where different parts of the process are established by corporate and the Entity, the relevant process evidence from each level will be verified. Implementation evidence will be reviewed at the level responsible for each part of the process.

    Corporate-level process and implementation options only apply to:

    • Greenhouse Gas (GHG) Emissions Management and Reporting
    • Materials Restriction
    • Responsible Sourcing of Minerals
    • Supplier Responsibility

12.2 Documentation

With regard to documenting a policy, procedures, control steps, or other documents, Entities do not need to have a separate policy or procedure for each item in this document. The Entity can fit the noted items into your existing policy and procedure structure in a way that allows:

  • Responsible staff (e.g., human resources, legal, EHS) to clearly understand what they are expected to execute, monitor, and control; as well as uphold themselves in an efficient and effective manner.
  • Workers and suppliers to understand the expectations.

For instance, if the Entity has a single labor policy document, it might be best to integrate the items from the RBA Code provisions in labor into that single labor policy.

12.3 Applicability

All Standard elements apply to all in-scope workers, including temporary, migrant, student, and contract, directly and indirectly, employed workers that work in the factory/on production/in the warehouse and any other type of worker/employee, including any on-site suppliers and contractors and on-site service providers (OSPs), unless the Standard element specifically states a narrower focus group.

12.4 "Stricter-of"

The RBA expectation is that companies are to follow the "stricter of": Local law, the RBA Code of conduct, the valid Collective Bargaining Agreement (CBA), or customer requirements (if applicable). Conversely, the RBA does not expect a company to violate local law in order to comply with the RBA Code. Carefully consider and determine whether the law is truly requiring the Entity to do something, or rather it is allowing the Entity to do something.

  • A Collective Bargaining Agreement may create requirements beyond the RBA Code requirements. The assessment process shall not validate CBA compliance where it is stricter than the RBA Code.

A common example is a workers resignation notice period time. The RBA prohibits requiring in-scope workers (those covered by overtime law or impacted by production levels) from needing to provide and serve more than one month of resignation notice AND this must be documented in their employment agreement. Many countries have laws speaking to longer resignation notice timelines; however, these are typically there to cover situations where the worker was not provided with an employment agreement. In this case then the RBA Code is stricter, and workers should not be required to provide notice of resignation of more than one month in advance.

It is not sufficient to verbally say that the Entity follows a particular local law, regulation, statute, or customer requirement. Applicable laws, regulations, statutes, and customer requirements need to be integrated into company policies. For instance, if the minimum hiring age in the country where the Entity is located is 16, then the company policy needs to note that the minimum hiring age is 16 (or higher if the Entity chooses, or if it is required by customers).

12.6 Adequate and Effective

Adequate shall mean appropriate and complete for its intended purpose. In practice, it means all required code compliance elements are covered/addressed in policy, process or procedures.

Effective shall mean successfully achieves its intended goal or outcome. In practice, this means all implementation elements are deployed, and the outcome of process/procedure meets the RBA requirement.

12.7 Valid ISO 45001 or ISO 14001 Certification

If the Entity presents a valid ISO 45001 and/or ISO 14001 certificate as part of their SAQ, a portion of their Assessment effort can be reduced. To enable this, the relevant parts of the SAQ must be filled by the Entity, and the SAQ must be released on RBA-Online.

The relevant SAQ questions for this purpose, as per the 2026 SAQ, are as below:

  • ISO 45001: HSC1 (acknowledgement) and HSC1-a (attachment)
  • ISO 14001: EVC1 (acknowledgement) and EVC1-a (attachment)

Both the acknowledgement and the attachment must be available for the specific ISO certificate to be considered.

If valid certification is available in the SAQ, during the on-site Assessment, the Assessor will exclude or adjust the review of the relevant management system elements as mapped below:

Valid ISO 45001 Valid ISO 45001 Valid ISO 14001 Valid ISO 14001
B.M.1 If there are customer-specific requirements, verify.
Skip the rest of the requirements.
C.M.1 Skip
B.M.2 Skip C.M.2 Skip
B.M.3 Fully verify the grievance mechanism elements.
Skip the rest of the requirements.
C.M.3 Fully verify the grievance mechanism elements.
Skip the rest of the requirements.
B.M.4 Skip C.M.4 Skip
E4 Same rules apply to Supplier Management checks if there is a valid ISO certificate. E4 Same rules apply to Supplier Management checks if there is a valid ISO certificate.

IMPORTANT: There will be no change to the scoped on-site assessment time.

If the certification was not presented by the Entity as part of the SAQ process, the certificates will not be considered towards assessment scoping or performance.

12.8 Process-Based Management System: Small and Medium Sized Entities

For the purpose of the RBA Assessments, including VAP, Small and Medium Sized Enterprises (SMEs) are Entities with a workforce of less than 250 in-scope workers.

Small and Medium Sized Entities in the supply chain of the RBA members may have less formal management systems. This means less procedures and fewer written directions.

In such cases, Assessors must still triangulate the availability and effectiveness of the management systems in line with the RBA Code requirements. This can be done via triangulating other sources of information, including but not limited to:

  • Clear and consistent ownership of tasks
  • Consistency of information and instructions amongst management and workers
  • Consistent and readily-available implementation records

12.9 Communication and Training

It is important that staff and workers responsible for implementing and conforming to any policies and procedures are aware of them. A communication and training plan, with periodic refreshing should occur.

All communications from the Entity to workers shall be done in a language the worker can understand unless otherwise stated in this Standard. If this is not the case, the relevant aspect is, at minimum, a 'Major' non-conformance.

12.10 Freedom of Association and Collective Bargaining

The reference to "trade union" throughout this guidance refers to trade unions, unions, and other worker representative bodies.

Where applicable laws and regulations restrict the right of freedom of association, workers shall be allowed to elect and join alternate lawful forms of worker representations.

Neutrality statement: The Entity ensures workers can exercise their rights to organize in a climate free of violence, pressure, fear, and threats. The Entity is not required to support workers' efforts to associate or organize actively.


References

The following references were used in preparing the RBA Code of Conduct (up to version 8.0) and may be useful sources of additional information:

Standards and Conventions:

Other Useful References:


RBA VAP Standard V8.1.0 | RBA Public

Assessment Criteria
Conformity Topics

Conformity topics covered by this profile, drawn from the UN/CEFACT conformity topic classification.

Air Quality Management

Controlling and reducing non-GHG air pollutant emissions including SOx, NOx, VOCs, particulates, and ozone-depleting substances from operations and production processes.

Anti-Corruption Measures

Preventing bribery, extortion, and corrupt practices through policies, controls, and organizational culture.

Chemical Safety

Restriction and responsible management of hazardous substances in materials, products, and production processes.

Competitive Fairness

Ensuring fair market practices, preventing anti-competitive behavior, and maintaining a level playing field.

Data Privacy

Protection of personal information and responsible data handling in compliance with privacy regulations and ethical standards.

Decent Work Conditions

Provision of fair wages, reasonable working hours, and dignified employment conditions throughout the supply chain.

Emergency Readiness

Preparedness planning, training, and response capabilities for workplace emergencies including fire, chemical spills, and natural disasters.

Energy Optimization

Improving energy efficiency across supply chain operations including manufacturing, logistics, and warehousing.

Ergonomic Design

Designing safe physical work environments that minimize musculoskeletal strain and support worker comfort and productivity.

Ethical Material Sourcing

Procuring raw materials through sustainable and responsible practices, avoiding conflict minerals and environmentally destructive extraction.

Exposure Management

Controlling worker exposure to harmful chemical, biological, and physical agents through monitoring and protective measures.

Feedback Channels

Accessible grievance mechanisms, whistleblower protections, and feedback systems for workers, communities, and stakeholders to raise concerns without fear of retaliation.

Forced Labor Elimination

Preventing all forms of forced, bonded, or compulsory labor including debt bondage and human trafficking in supply chains.

Gender Equity

Promoting gender diversity, equal opportunity, and elimination of gender-based discrimination in employment and business practices.

Greenhouse Gas Emissions

Measuring, reporting, and reducing greenhouse gas emissions (CO2, methane, N2O, F-gases) across production, transport, and supply chain activities.

Healthcare Access

Providing access to medical support, occupational health services, and health insurance for workers.

Intellectual Property Protection

Respecting intellectual property rights including patents, trademarks, copyrights, and trade secrets.

Legal Compliance

Adherence to applicable laws, regulations, and legal obligations in all jurisdictions of operation.

Living Conditions

Ensuring safe, sanitary, and dignified accommodation for workers where employer-provided housing is applicable.

Nutrition Standards

Ensuring safe, adequate, and nutritious food provisions for workers where employer-provided meals are applicable.

Open Reporting

Transparent disclosure of environmental, social, and governance performance to stakeholders and the public.

Renewable Energy Use

Transition to sustainable energy sources including solar, wind, hydro, and other renewables in production and operations.

Responsible Procurement

Ethical sourcing and purchasing practices that consider environmental, social, and governance factors in supplier selection.

Rights and Equality

Ensuring non-discrimination and equal treatment regardless of race, gender, religion, disability, or other protected characteristics.

Substance Control

Banning or restricting harmful materials and substances of concern in product composition and manufacturing.

Supplier Sustainability

Ensuring suppliers meet environmental, social, and governance requirements through assessment, monitoring, and collaboration.

Supply Chain Labor Rights

Ensuring fair treatment of workers throughout the supply chain including subcontractors and informal workers.

Supply Chain Traceability

Tracking product origins, components, and transformations throughout the supply chain to enable transparency and accountability.

Sustainability Policies

Formal organizational commitments, policies, and targets for environmental, social, and governance performance.

Transparent Communication

Public disclosure and reporting of sustainability policies, performance, and progress to stakeholders.

Waste Minimization

Reducing waste generation through prevention, reuse, and improved production processes across the product lifecycle.

Water Conservation

Sustainable water management including efficient use, pollution prevention, and watershed protection throughout operations and supply chains.

Worker Representation

Respecting freedom of association, collective bargaining rights, and worker participation in workplace governance.

Workplace Hazard Control

Systematic identification, assessment, and mitigation of workplace hazards to reduce risk of injury and illness, including incident reporting, investigation, and corrective action.

Workplace Safety

Protecting worker health and safety through hazard prevention, protective equipment, and safe working environments.

Youth Protection

Safeguarding young workers from hazardous conditions and eliminating child labor in all forms across supply chains.

Criterion Scoring Framework

The scoring framework defines severity levels used to classify findings during VAP assessments.

PRI: Priority Non-conformance

Severity: 1
Definition: "Immediate risk of severe or irreversible harm to life or health, Entity, the environment, or the community. "Immediate risk" refers to conditions where exposure to severe harm exists at the time of assessment, not merely a potential future risk; OR an egregious ethical breach, including (but not limited to) actions that fundamentally violate ethical or human rights principles."

MAJ: Major Non-conformance

Severity: 2
Definition: "Violation of applicable law; OR a system-level process deficiency that results in significant risk or impact, for example the same incident multiple times or multiple incidents at the same time; OR a system-level process deficiency that causes the system to not work as designed."

MIN: Minor Non-conformance

Severity: 3
Definition: "An isolated implementation failure where the relevant management system is in place and generally effective; OR a system-level process deficiency that results in low associated risk and impact. The Assessor shall document a clear justification addressing why the risk is low, the impact is limited, and existing controls prevent the issue from escalating."

RON: Risk of Non-conformance

Severity: 4
Definition: "A condition where no non-conformance is currently identified, but the effectiveness of controls to ensure sustained conformance cannot yet be demonstrated across foreseeable operating conditions or changes. If evidence demonstrates that the management system or controls have already failed to prevent or detect a breach of the requirement under normal operating conditions, the issue shall be evaluated as a non-conformance, not as a risk of non-conformance; OR insufficient evidence to confirm conformance or non-conformance."

OFI: Opportunity for Improvement

Severity: 5
Definition: "(Only applicable to Working Hours criteria) A situation that is not fully in conformance and can be improved. A Corrective Action Plan is optional but recommended."

CON: Conformance

Severity: 6
Definition: "Conformance is noted when the Assessor determines that an Entity meets or exceeds the assessment criteria and expectations."

Recognition Levels

Overall facility assessment recognition tiers based on cumulative finding severity and score calculation.

PLAT: Platinum

Min Score: 180
Definition: "Score 180-200. No Priority or Major findings. Industry-leading."

GOLD: Gold

Min Score: 160
Definition: "Score 160-179. No Priority findings. Excellent performance."

SILV: Silver

Min Score: 140
Definition: "Score 140-159. No Priority findings. Good performance."

REC: Recognized

Min Score: 100
Definition: "Score 100-139. No open Priority findings. Baseline."

LOW: Low Performance

Min Score: 0
Definition: "Score below 100. Below minimum threshold."

Standard Alignment
NameAlignment Level
UN Guiding Principles on Business and Human Rights Meets
UN Global Compact Ten Principles Meets
OECD Guidelines for Multinational Enterprises Meets
OECD Due Diligence Guidance for Responsible Supply Chains Meets
ISO 26000:2010 Guidance on Social Responsibility Meets
ISO 14001:2015 Environmental Management Systems Meets
ISO 45001:2018 Occupational Health and Safety Meets
ILO C029 - Forced Labour Convention (1930) Meets
ILO C087 - Freedom of Association Convention (1948) Meets
ILO C098 - Right to Organise and Collective Bargaining (1949) Meets
ILO C100 - Equal Remuneration Convention (1951) Meets
ILO C105 - Abolition of Forced Labour Convention (1957) Meets
ILO C111 - Discrimination Convention (1958) Meets
ILO C138 - Minimum Age Convention (1973) Meets
ILO C155 - Occupational Safety and Health Convention (1981) Meets
ILO C182 - Worst Forms of Child Labour Convention (1999) Meets
ILO C187 - Promotional Framework for OHS Convention (2006) Meets
UN Convention Against Corruption Meets
UN Convention on the Rights of the Child Meets
CEDAW - Convention on Elimination of Discrimination Against Women Meets
Regulatory Alignment
NameJurisdictionAlignment Level
Dodd-Frank Act Section 1502 US Meets
Federal Acquisition Regulation - Combating Trafficking in Persons US Meets
EU Conflict Minerals Regulation 2017/821 EU Meets
UK Modern Slavery Act 2015 UK Meets
German Supply Chain Due Diligence Act (LkSG) DE Meets
Australian Modern Slavery Act 2018 AU Meets
Scope
CodeNameClassification
26 Manufacture of computer, electronic and optical products ISIC Rev.4
27 Manufacture of electrical equipment ISIC Rev.4
28 Manufacture of machinery and equipment ISIC Rev.4
29 Manufacture of motor vehicles ISIC Rev.4
30 Manufacture of other transport equipment ISIC Rev.4
62 Computer programming and consultancy ISIC Rev.4
Change Log

8.1.0 (2026-09-27)

Changed

  • Alignment of content and language in line with the VAP v8.1 changes.
  • Addition of further procedural information on the VAP and RBA Assessments that use the VAP Protocol.
  • Addition of core requirements and specific conditions that are aligned with the Code Interpretation Guidance.
  • Additional and updated Annexes.
  • Percentage-based rules related to checklist elements have been removed from the severity guidance.

8.0.3 (2026-06-13)

Changed

  • SVAP Forced Labor sub-profile updated

8.0.2 (2025-04-01)

Added

  • Corporate-level GHG implementation foundation section (C6)

Changed

  • Education loan threshold increased from 60% to 120% of monthly gross base salary (A1)
  • Simplified industrial vehicle driver licensing wording (B1)
  • GHG policy reporting scope expanded for corporate vs facility level (C6)
  • Simplified next-tier supplier expectation requirements (E4)
  • Broadened self-assessment tool references from RBA-specific to generic (E4)

Removed

  • Refrigeration requirement for lactation rooms (B1)
  • Severe finding threshold for training timeliness in environmental management (CM)
  • Severe finding threshold for training timeliness in ethics management (DM)

8.0.1 (2024-01-01)

Added

  • Complete criterion library for Code of Conduct 8.0
  • Updated scoring framework with revised CAP timelines
  • Internal migrant worker provisions across labor criteria
  • Enhanced recruitment fee remediation requirements (A1)
  • Pandemic and emergency response provisions (B2)
  • EU CSDDD regulatory alignment
  • German LkSG regulatory alignment
  • Spanish (es) and Chinese (zh) translations for all criteria

Changed

  • Working hours thresholds updated per Code 8.0 (A3)
  • Wage and benefits requirements enhanced (A4)
  • Management system criteria restructured with sub-elements (AM)
  • Priority finding CAP timeline exceptions for working hours and social insurance
  • Scoring framework severity levels refined with clearer definitions

8.0.0 (2023-09-01)

Added

  • Industrial Forbidden Process Chemicals (IFPC) mandates (B4)
  • Cobalt added to responsible minerals scope, 3TG -> 3TG+C (E3)

Changed

  • A1 renamed Freely Chosen Employment -> Prohibition of Forced Labor; education-loan no-interest added
  • Young-worker and wage thresholds tightened (A2, A4)
  • Supplier responsibility ratings expanded (E4)

7.1.2 (2022-06-01)

Added

  • Category-specific management-system criteria AM/BM/CM/DM (split from the 7.0.0 generic system)
  • Time-record accuracy requirements across working-hours criteria

Changed

  • Young-worker overtime/night-work Priority triggers expanded (A3)
  • Discrimination/harassment scope broadened (A5)
  • Responsible-minerals due-diligence threshold tightened to >20% (E3)

Removed

  • Health and Safety Communication (B8) discontinued
  • Pollution Prevention and Resource Reduction (C2) discontinued

7.0.0 (2021-01-01)

Added

  • Initial 35-criterion VAP composition under RBA Code of Conduct 7.0