Criterion: Environmental Permits and Reporting

Version 3.0.0 | Status: Active
Supersedes: 2.0.0
UN conformity topic code:

Requirements for environmental permits, approvals, and regulatory reporting

Full Description

C1. Environmental Permits and Reporting

Code 8.0

All required environmental permits (e.g. discharge monitoring), approvals, and registrations shall be obtained, maintained, and kept current, and their operational and reporting requirements shall be followed.

Minimum Conformance Requirements

Core Requirement Specific Conditions
All required environmental regulatory documents are in place and valid, and submitted to the government per applicable laws and regulations (if required). Permits/certifications/reports, where relevant, are in place and valid, including:
• Operating permit
• Air emissions
• Wastewater discharge
• Stormwater management
• Hazardous materials storage, use and labeling requirements
• Generation of waste (solid and hazardous), and storage and labeling requirements
• Professional certificates, including any required qualifications/certifications for environmental compliance and management
Required environmental postings are up-to-date and publicly visible.

Serious conditions that would be considered as priority risk as per the RBA Code

  • Not properly reporting environmental accidents or incidents, which are deemed reportable by authorities, to the governing agency as required by law.
  • Delay in mandatory government reporting in excess of 3 months from the due date.

Additional Guidance

  1. Processes & Practices are in place such that:

    • a. The Entity keeps a registry or inventory of environmental permits, licenses and certifications including their monitoring and reporting requirements, expiration dates, etc.
    • b. Permits, licenses, and certifications are kept current and updated as necessary as operations changes occur.
    • c. If environmental violations were identified, they have been remediated and are considered closed by the appropriate authorities.
  2. Controls & Monitoring include:

    • a. Tools, systems, and processes are properly tested, calibrated, and otherwise maintained to demonstrate accuracy in measurement, indication, and recording.
    • b. Entity operations are in compliance with all monitoring, reporting and other permit requirements based on:
      • i. Internal monitoring and assessments
      • ii. Independent third-party assessments
      • iii. Regulatory agency reviews/inspections
  3. Records are maintained including:

    • a. All the environmental permits required by law
    • b. Certifications as required by law
Profiles using this criterion

RBA Assessment Program

Related Criterion

VAP: Environmental Management System

Relationship: Parent
Management system for environmental practices

VAP: Hazardous Substances

Relationship: Related
Hazardous materials permits and reporting

VAP: Air Emissions

Relationship: Related
Air emissions permits and monitoring

VAP: Water Management

Relationship: Related
Wastewater discharge permits

Change Log

3.0.0 (2026-09-27)

Changed

  • Postings must be publicly visible and labeling added to permit scope; policy/procedure items now guidance: Environmental postings moved from an advisory NOTE ('posted as required by law') to a core requirement that postings are up-to-date and publicly visible. Hazardous materials and waste permit scope now explicitly includes storage and labeling requirements (old list covered storage/use and generation only). Boundary noise limits and 'other equipment' dropped from the required permit list; Environment ERT member qualifications replaced by professional certificates for environmental compliance and management. Policy elements, the permit registry, the renewal process, remediation/closure of all violations, calibration and monitoring controls moved from required Elements to non-binding Additional Guidance. Priority trigger for unreported accidents/incidents narrowed to incidents 'deemed reportable by authorities'; 3-month late-reporting priority trigger unchanged.

2.0.0 (2022-06-01)

Changed

  • Added a new severe-finding trigger for unreported environmental accidents/incidents: A new Priority (severe-finding) trigger was introduced: failing to report reportable environmental accidents or incidents to the governing agency as required by law. In 7.0.0 this trigger did not exist (C1.1 Priority was 'Not applicable' and C1.2 Priority was only 'Mandatory government reporting late > 3 months'). A facility that passed under 7.0.0 with all permits valid and reports timely, but failed to report a reportable environmental accident, now fails — a prior pass can become a fail, hence major. Additive 'Professional certificates' and 'Environment ERT qualifications' conformance items and the Major/Minor genericisation are non-breaking on their own.

1.0.0 (2021-01-01)

Changed

  • Initial historical baseline — Environmental Permits and Reporting (RBA Code of Conduct 7.0): Earliest imported version of the criterion. Requires all environmental permits, approvals, licenses and registrations to be obtained, maintained and kept current, with operational and reporting requirements followed. Records cover operating permits, air emissions, wastewater discharge, storm water exposure, hazardous materials storage and use, and generation of waste. The only severe-finding (Priority) trigger is mandatory government reporting delayed more than 3 months from the due date. No accident/incident reporting Priority and no professional certificate / Environment ERT qualification conformance items yet.